1. The form of
通気口 ホールを通る風を形成するための要件を満たすように努める必要があります。
2. When the fresh air and exhaust vents of new buildings are set on the load-bearing wall, holes should be reserved during the main construction. When a new air outlet is added on the load-bearing wall of an existing building, the original design unit should be reported to the original design unit for design and verification to meet the minimum opening size and opening position requirements of the structure. If the requirements are not met, reinforcement treatment should be performed.
3. For the air inlet of natural ventilation, doors, holes, casement windows or vertically rotating windows, panels, etc. should be used according to the process characteristics. The sash used for natural ventilation should be easy to open and close manually.手動切替が不便な窓サッシや頻繁に調整が必要な窓サッシには切替装置を設ける必要があります。
4. 自然換気口としてシャッターを設置した病院の建物には、雨水の浸入を防ぐ措置を講じる必要があります。